Projects participation
Wordwide Health Safety and Environmental
Details Description of the project involvement
Project HSE Manager

NordSeeCluster Windfarm
Project scope of work includes the installation of 104 extended monopiles as well as the installation of scour protection. First phase include installation of 44 monopiles, with the remaining 60 units slated for second phase. The Nordseecluster is being implemented in two phases, the 660 MW Nordseecluster A and the 900 MW Nordseecluster B, each comprising two offshore wind farms.
Project HSE Manager

FSRU Wilhelmshaven
Construction of the Floating Storage and Regasification Unit (FSRU) jetty at Wilhelmshaven.The project was managed by FSRU Wilhelmshaven GmbH, a joint venture between ENGIE and TES. By leveraging its experience in dredging, infrastructure and offshore energy
Project HSE Coordinator

Vox Apolonia commissioning project
The project in Moerdijk consists in commissioning of Vox Apolonia dredging vessel
Project HSE Coordinator

Vox Ariane maintenance project
The project in Moerdijk consists in overall maintenance of Vox Ariane dredging vessel
Project HSE Coordinator

Vox Apolonia commissioning project
The project in Moerdijk consists in commissioning of Vox Apolonia dredging vessel
Project HSE Coordinator

Klaipeda dredging project
The project in Klaipeda consists of dredging about 2 million m3 of material for the deepening of the port area to a depth of -15.5 m. The current depth is approximately -15.0 m. The material to be dredged consists of soft material and boulders. This dredged material will be dumped at an offshore dump location about 20km offshore from the Port entrance
Hollandse Kust Zuid Project
Petrofac confirms award of the Hollandse Kust Zuid (HKZ) offshore grid connection Beta HVAC platform (substation) in the North Sea by TenneT, the Dutch-German transmission grid operator. This follows the award of the contract for HKZ platform Alpha in July 2018 and subsequent confirmation of HKZ platform Beta option. A total of eight 700-megawatt standardised concept transformer substations will be installed offshore of the Netherlands until 2030. Petrofac is responsible for the engineering, procurement, construction and installation (EPCI) of both the third (HKZ platform Alpha) and fourth (HKZ platform Beta) substations which have a total contract value of approximately US$200 million.
Installation of the 62 jacket foundations for the Saint-Brieuc offshore wind farm in France is progressing steadily. To date, Van Oord has successfully completed the installation of 24 jacket foundations. Meanwhile, Van Oord’s offshore installation vessel Aeolus is continuing with pre-piling works at the remaining foundation locations. Almost half of the wind farm foundation locations have been drilled and equipped with pin piles. The works will be completed in 2023.
Shah Deniz 2 Project
The SD2 Project aims at delivering 16Bcma of gas sales, with peak condensate rates of 105Mbd through the installation of additional wells within the high-pressure gas-condensate SD Contract Area located approximately 70km south east of Baku. Two marine export pipelines transport gas and condensate to onshore reception, gas-processing and condensate facilities located at the Sangachal Terminal (ST), approximately 55km south west of Baku.
Decommissioning Project
The Gloria offshore platform has reached the end of its economic lifetime after more than 40 years in service. OMV Petrom contracted GSP Offshore, a Romanian company, for the removal services. The solution consisted in reinstating the platform jacking system, positioning the Gloria platform on a cargo barge (GSP Big Foot2) and transporting it to the shore.
Shah Deniz 2 Project
BP, on behalf of the Shah Deniz consortium, has awarded to the Saipem, Bos Shelf and Star Gulf consortium, a Transportation and Installation contract for the Stage 2 development of the Shah Deniz field. The field is located 55 miles (90 kilometers) offshore Azerbaijan, in water depths from 246 feet (75 meters) to 1,804 feet (550 meters). The scope of work of the contract includes the transportation and installation of jackets, topsides and subsea production systems and subsea structures, the laying of over 223 miles (360 kilometers) pipelines, diving support services and the upgrade of the Pipelay Barge Israfil Huseinov (PLBH) installation vessels .
Health Safety Environment Engineer